Phase inspections
(New construction)
- Pre-Pour (Foundation): Check footing, rebar, vapor barrier, and plumbing before concrete is poured.
- Framing / Rough-In: Review structure, roofing, windows/doors, and major systems before drywall.
- Final Walkthrough: Full top-to-bottom inspection before closing.
- 11-Month Warranty: Catch issues before the builder’s warranty runs out.
Individual Phases (≤ 2,500 sq ft):
- Pre-Pour (Foundation): $200–$250
- Framing / Rough-In: $250–$300
- Final Walkthrough (Full Home): $400+
- 11-Month Warranty: $300–$350
Phase Package Pricing
- 3-Phase Package (Pre-Pour + Framing + Final):
$800–$850 - Full 4-Phase Package (all phases + 11-Month):
$1,050–$1,100